Skip to content
Field day: Measurement in an irrigation network that has switched to a closed system

Field day: Measurement in an irrigation network that has switched to a closed system

17 October 2026 09:30 – 13:00 Kozan, Adana 5 participant

Half-day trip to see meter, pressure, and soil moisture measurement in the field during the transition to a piped network.

Participants examine the installation of meters and sensors in the field; documents required for the grant application are discussed.